CDU
Modular Hydro Cooling Mining Solution
200kW Sufficient Cooling Capacity.
Meet the heat dissipation demand of hydro cooling mining system.
Compatible with Whatsminer/Antminer Rack System.
42U modular rack system design
Designed for Bitcoin Mining Heat Recovery.
Solution designed according to heating needs, optional dry cooler or cooling tower.


Reviews
There are no reviews yet.